viernes, 4 de abril de 2008

Handing RJ45 Jacks

Product : RJ45 Jacks connectors over cat6.
Part Involved : Infrastructure of telecomunication room.
Summary: Management the ending of the horizontal cabling inside telecomunication rooms.
Scenario : A burst growing of the LAN data ports in your company.
Company : National Institute of Cancer of Peru (INEN).
Reference Date : April 2008.

Although add new data ports to the current structured cabling involved civil works in order to tending the cable, then another bottleneck does not consider the most time is the distribution of the space inside of the telecomunication room. Check with the next video , how the ending cable cat6 is not easy to hand -the cable is not soft, can be damaged if there is no previous precaution during tending task - and when this point is reached certainly the personnel assigned to this job come very dirty.

It is important to clear that pin wire assigned color of RJ45 jack connector of the telecomunication room should be fix with the RJ45 jack connector of the outlet box (office) assigned to that cabling connection.

The first part of video shows the procedure to insert the wire into RJ45 Jack connector following the color code based on Code A or Code B -assigning the same to telecomunication room and office- and put the connector inside of the patch panel, while the second part is focused on the front view of the telecomunication room to connect the patch cord from the patch panel port to the free switch port.

The full version is available on "YouTube videos hosted by German Medina" at the bottom right side of this page.